4" Diesel Truck Muffler Delete Pipe Eliminator DPF For 08-10 Ford F250 F350 F450 F550 Super Duty 6.4L

In stock
SKU
APSSNE106336
  • Free Shipping - 48 US States(SHIPS FROM US)
Quick Overview

Exhaust Pipe,Muffler,Delete Pipe,Eliminator,DPF,Ford Super Duty 6.4L,2008,2009,2010,F250 F350 F450 F550 Super Duty, 4"

$184.71

Item specifics:

Fitment:2008-2010 Ford F250 Super Duty, 2008-2010 Ford F350 Super Duty, etc.
High Quality Material
No Leakage and Crack
High Horsepower and Torque
Maximizing Smoothest High Exhaust Air Flow Rate


Features:

Directs exhaust gases away from the engine.
Reduces engine noise by muffling the sound of exhaust gases.
Helps to improve fuel efficiency by regulating backpressure in the exhaust system.
Prevents harmful gases and pollutants from entering the cabin.


Note:

1. Professional installation is recommended.
2. Please don't hesitate to write to us if you have any problems. We are always here to help you.


Fitment:

Ford F-250 Super Duty    2008~2010    6.4L
Ford F-350 Super Duty    2008~2010    6.4L
Ford F-450 Super Duty    2008~2010    6.4L
Ford F-550 Super Duty    2008~2010    6.4L


Package including:

2x Muffler Delete Pipes
Hardwares as Shown in the Picture Above

⚠️WARNING: This product can expose you to chemical which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.

Write Your Own Review
You're reviewing:4" Diesel Truck Muffler Delete Pipe Eliminator DPF For 08-10 Ford F250 F350 F450 F550 Super Duty 6.4L
Your Rating

Shipping Policy

Please confirm the shipping address and billing address. The shipping address should be a physical address, we DO NOT ship to the P.O. box address.

Handling Time

Once the order was placed please allow us 1-2 business days for packing and shipping, checking the order information is a very important step to build a better shopping experience.
Special Case: For the transaction paid by using a PayPal eCheck, the payment will be completed within 3-6 business days. The handing and shipping should be started up as soon as the payment is successful.