2015-2016 Chevy Duramax Diesel 6.6L 3" Stainless Black Downpipe Exhaust

In stock
SKU
APSSN001197
  • Free Shipping - 48 US States(SHIPS FROM US)
Quick Overview
Chevrolet Silverado, GMC Sierra, 3" Mandrel-Bent, T304 Stainless Steel, Downpipe/Bolt
Special Price $101.84 Regular Price $132.39

Description:

  • 100% Brand New,never been use
  • 3" Mandrel-Bent
  • Spiral Wrapped For Heat Control
  • 304 Stainless Steel Construction 
  • Remove your crushed oval-shaped stock down-pipe and replace it with a smooth, round, long-lasting full 304 stainless steel Down-Pipe from PPE. Exceed Original Equipment Standards and Performance
  • Professional Installation is Highly Recommended (No Instruction Included).

 

Package includes:

  • As the pictures shown

 

Fitment:

  • For 2015.5-2016 Chevy Gmc 6.6l Duramax
  • For Year and Model, Please Check Compatibility  

⚠️WARNING: This product can expose you to chemical which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.

VEHICLE NAMEYearEngine
Chevrolet Express 25002015~20166.6L
Chevrolet Express 35002015~20166.6L
Chevrolet Express 45002015~20166.6L
Chevrolet Silverado 2500 HD2015~20166.6L
Chevrolet Silverado 3500 HD2015~20166.6L
GMC Savana 25002015~20166.6L
GMC Savana 35002015~20166.6L
GMC Savana 45002015~20166.6L
GMC Sierra 2500 HD2015~20166.6L
GMC Sierra 3500 HD2015~20166.6L
Write Your Own Review
You're reviewing:2015-2016 Chevy Duramax Diesel 6.6L 3" Stainless Black Downpipe Exhaust
Your Rating

Shipping Policy

Please confirm the shipping address and billing address. The shipping address should be a physical address, we DO NOT ship to the P.O. box address.

Handling Time

Once the order was placed please allow us 1-2 business days for packing and shipping, checking the order information is a very important step to build a better shopping experience.
Special Case: For the transaction paid by using a PayPal eCheck, the payment will be completed within 3-6 business days. The handing and shipping should be started up as soon as the payment is successful.