For 2011-2015 Chevy Silverado GMC 2500 3500 HD Diesel Exhaust Pipe Delete Pipe Exhaust Pipes

In stock
SKU
APSSNE106340
  • Free Shipping - 48 US States(SHIPS FROM US)
Quick Overview

2011,2012,2013,2014,2015,Silverado 2500 HD, Silverado 3500 HD,Sierra 2500 HD,Sierra 3500 HD,TSUS409 Stainless Steel, Pipe,Muffler Delete Pipe,Bolts,Clamps,DPF,Eliminator

$345.97

Item specifics:

Manufacturer Warranty: 1 Year
Inlet Diameter: 3.5-4"
Thickness: 2mm
Color: Silver
Material: Aluminum
Type: Exhaust Pipe & Tip
Finish: Aluminised Steel
Mounting Style: Clamp-on
Fitment Type: Performance/Custom
Mounting Hardware Included: Yes


Features:

Directs exhaust gases away from the engine.
Reduces engine noise by muffling the sound of exhaust gases.
Helps to improve fuel efficiency by regulating backpressure in the exhaust system.
Prevents harmful gases and pollutants from entering the cabin.


Fitment:

Chevrolet Silverado 2500 HD    2011~2015    6.6L
Chevrolet Silverado 3500 HD    2011~2015    6.6L
GMC Sierra 2500 HD    2011~2015    6.0L|6.6L
GMC Sierra 3500 HD    2011~2015    6.0L|6.6L


Package including:

3X Muffler Delete Pipe
3X Clamp
2X Bolts
As Pictures Shown

Hardwares as Shown in the Picture Above

⚠️WARNING: This product can expose you to chemical which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov.

Write Your Own Review
You're reviewing:For 2011-2015 Chevy Silverado GMC 2500 3500 HD Diesel Exhaust Pipe Delete Pipe Exhaust Pipes
Your Rating

Shipping Policy

Please confirm the shipping address and billing address. The shipping address should be a physical address, we DO NOT ship to the P.O. box address.

Handling Time

Once the order was placed please allow us 1-2 business days for packing and shipping, checking the order information is a very important step to build a better shopping experience.
Special Case: For the transaction paid by using a PayPal eCheck, the payment will be completed within 3-6 business days. The handing and shipping should be started up as soon as the payment is successful.